<html>
<head>
<meta http-equiv="Content-Type" content="text/html; charset=us-ascii">
<meta name="Generator" content="Microsoft Exchange Server">
<!-- converted from text --><style><!-- .EmailQuote { margin-left: 1pt; padding-left: 4pt; border-left: #800000 2px solid; } --></style>
</head>
<body>
<div dir="auto">Shawn,
<div dir="auto"><br>
</div>
<div dir="auto">Generator has been set to auto, the door was not locked.</div>
<div dir="auto"><br>
</div>
<div dir="auto">Scott</div>
<div><br>
</div>
<div><br>
</div>
<div>-------- Original message --------</div>
<div>From: shawn via Cougar <cougar@sea.sbe16.org> </div>
<div>Date: 9/11/19 9:09 PM (GMT-08:00) </div>
<div>To: K7CR <k7cr@blarg.net>, 'Cougar Mt Users' <cougar@sea.sbe16.org> </div>
<div>Subject: Re: [Cougar] Fwd: Cougar Repeater Scheduled Power Outage on Wednesday
</div>
<div><br>
</div>
</div>
<font size="2"><span style="font-size:10pt;">
<div class="PlainText">AFAIK, its a site generator, so I'm guessing Ratelco; I know its one of
<br>
the ones that was services over the summer.<br>
<br>
--Shawn<br>
--K7ATA<br>
<br>
On 9/11/2019 8:18 PM, K7CR wrote:<br>
> He Shawn -<br>
><br>
> Who owns the Generator?<br>
><br>
> Just curious -<br>
><br>
> Clay, K7CR<br>
><br>
> -----Original Message-----<br>
> From: Cougar [<a href="mailto:cougar-bounces@sea.sbe16.org">mailto:cougar-bounces@sea.sbe16.org</a>] On Behalf Of shawn via Cougar<br>
> Sent: Wednesday, September 11, 2019 5:59 PM<br>
> To: Purdy, Robert via Cougar<br>
> Subject: [Cougar] Fwd: Cougar Repeater Scheduled Power Outage on Wednesday<br>
><br>
> Forwarding a snip from the amateur radio list; it appears that there's<br>
> some generator miss configuration up there still.<br>
><br>
><br>
> --Shawn<br>
> --K7ATA<br>
><br>
> -----------<br>
> Hi All,<br>
><br>
> I was on-site during the planned Utility Power outage today on Cougar<br>
> Mountain.<br>
><br>
> The PSE Contractor was running late so the scheduled outage from 09:00<br>
> to 11:00 actually occurred from 11:05 to 13:04. All the backup standby<br>
> generators on site kicked in when power was shut off, except for the one<br>
> powering Buildings B and E (ours).<br>
><br>
> Expecting something like this (based on past failures), I bought my own<br>
> Portable 2k Generator. So at no time was the cougar repeater down.<br>
> During the outage, the repeater was running on my generator just fine.<br>
><br>
> Upon inspection of the failed standby generator, I noticed that the<br>
> control panel indicated the system was in OFF not Auto. The cabinet was<br>
> locked, so I was unable to remedy this.<br>
><br>
> _______________________________________________<br>
> This List Server is provided by Hatfield & Dawson Consulting Engineers, Seattle, WA<br>
> Cougar mailing list<br>
> Cougar@sea.sbe16.org<br>
> <a href="http://sea.sbe16.org/mailman/listinfo/cougar">http://sea.sbe16.org/mailman/listinfo/cougar</a><br>
><br>
><br>
<br>
_______________________________________________<br>
This List Server is provided by Hatfield & Dawson Consulting Engineers, Seattle, WA<br>
Cougar mailing list<br>
Cougar@sea.sbe16.org<br>
<a href="http://sea.sbe16.org/mailman/listinfo/cougar">http://sea.sbe16.org/mailman/listinfo/cougar</a><br>
</div>
</span></font>
</body>
</html>